Breaking News
Home / Community / NM 30 in Pueblo of Santa Clara Roadway Reconstruction Resumes Work

NM 30 in Pueblo of Santa Clara Roadway Reconstruction Resumes Work

By NMDOT

The New Mexico Department of Transportation (NMDOT) continues roadway reconstruction on NM 30 from milepost 7.150 to milepost 7.610 in the Pueblo of Santa Clara.

On February 18, 2018, the contractor will resume work on NM 30 in the Pueblo of Santa Clara. NM 30 will have one lane of travel in each direction at all times. The speed limit is reduced to 25 mph in the work zone.

All side streets to the west side of the Santa Clara Pueblo, with the exception of Dawn Road will be OPENED to Santa Clara Pueblo local traffic.

Motorists are advised to watch for heavy truck traffic turning in and out of the work zone. Motorist can use US 84/285 to NM 502 as an alternate route to commute to and from Los Alamos.

Drivers are urged to proceed with caution through the work zone, watch for construction personnel, observe traffic control signs and reduce speed to the posted limit. Updates on this project will be posted on the New Mexico Department of Transportation’s road advisory website, www.nmroads.com

Check Also

Digestive Care With Christus St. Vincent

Gastroenterology is a branch of medicine that addresses the digestive system and diseases affecting the …